Skip to main content

Ostrava

Date of project/implementation: 2001/2001

  • Construction part of the documentation solves the substructure of the main hall and the other entire load bearing structures of the follow-up tribune, connecting bridge and object of the tennis club.
  • The foundation of the hall as well as the foundation of the other follow-up objects id designed as spread on the strips and foots.
  • The object of the tennis club is designed as a monolithic reinforced concrete construction supported by steel columns.