Skip to main content

Boskovice

Date of project/implementation: 2004/2004

  • The completion and the reconstruction was designed in relation to the existing object.
  • The reconstruction include changes which occurred with the change of use of the object and with the construction of the swimming pool.
  • Reinforced concrete pool structure and the structure of water slides including top steel roof structure of the building designed as frame construction.