PRESBETON – Bystrovany
Date of project/implementation: 2007-2008/2008-2009
The subject of documentation was the construction of the hall installed on the existing concrete columns of the crane runway. Construction of the hall was designed as steel. Foundation of new structures of the building and strengthening of existing foundation structures was designed using micro piles.