Skip to main content

Vendryně, Třinec

Date of project/implementation: 2005/2005

  • The construction part of the project documentation of the hall substructure and the load bearing structure of the follow-up tribune construction.
  • The substructure of the hall as well as the follow-up object is designed on bored piles FRANKI.
  • The tribune structure is designed as steel, resp. composite steel and concrete structure.