Skip to main content

Apartment building

Date of project/implementation: 2006/2006

  • Design of the load bearing structures of the objects SO 01, SO 02, SO 03.
  • The foundation is designed on the bored piles CFA.
  • The upper structure is designed as a reinforced concrete skeleton with precast columns and monolithic ceiling structures.