Skip to main content

Time museum in Šternberk

Date of project/implementation: 2001/2001

  • Design of all structures and rehabilitation.
  • Sanitation of the substructure and arches.
  • Design of the new composite steel and concrete ceiling structures.
  • New construction of the roof truss structure was designed from steel frames combined with wooden rafters.
  • Design of the steel stairs.