Skip to main content

Apartment building

Date of project/implementation: 2004/2004

  • Design of all load bearing structures.
  • The foundations of the new part of the object were designed on the bored piles CFA combined with grillage footing.
  • The foundations of the existing object MS-OB were strengthened using micro piles.
  • The upper structure was designed as a masonry structure with the filigreed ceilings.